Measuring a stockpile is one thing. Explaining why volumes changed, why numbers did not match across systems, and what finance, audit, royalty, JV, or regulatory stakeholders needed to see was another.
In this session, we walked through a stockpile reconciliation framework operators can use to connect what is measured in the field with what is reported in the books. We covered the key comparisons every site can run, how survey cadence affects confidence, and the common variables that create reconciliation drift, including shrink and swell, density assumptions, tonnes versus cubic metres, material movement, and rehandles.
You’ll come away with a repeatable process for reducing end of month surprises, building trust in inventory reporting, and creating a defensible audit trail for the stakeholders who rely on your stockpile numbers.
Who this session was for
Operations leaders, site managers, inventory and production teams, survey teams, technical services, finance stakeholders, and anyone responsible for stockpile confidence, reconciliation, or reporting.
What you’ll learn
- The difference between a measured stockpile number and a defensible one
- The three reconciliation comparisons that help surface issues early
- Why shrink and swell, density, and tonnes versus cubic metres can create reporting gaps
- How to choose the right survey cadence for your site or operation
- What stakeholders need to see in your reporting trail
Free tool
Start reconciling your stockpiles today
Work through a reporting trail checklist and a reconciliation worksheet that flags variance between measured and book tonnage. Import your own materials list and export the results as a PDF.
14-pt
reporting trail checklist for stockpile sign-off
Custom
variance threshold you set to flag reconciliation gaps
2 PDFs
checklist and worksheet, exported and ready to share

