Resource Center

Real stories, helpful guides, and the latest from the field.

Aerial 3D render of a data center construction site with graded earth, utility trenches, and drainage controls transitioning into a digital site map
Featured article

The data center environmental risk contractors can actually control

Data center projects move fast, disturb large areas, and invite scrutiny over how teams manage land, water, and utilities. A clear, timestamped site record is the environmental risk contractors can actually control.

How Progress Tracking Makes Mine Reclamation Easier
Read time: 6 mins
Blount Contracting Saves Processing Time, Easily Creates Machine Surfaces in Arizona
Read time: 5 mins
Keep Your Drone Data “Grounded” with Permanent Ground Control Points
Read time: 5 mins
Meet Your Engineering Team: Andrew McDowell
Read time: 4 mins
How Propeller Helps PMs Do Construction Pay Apps Faster
Read time: 3 mins
Meet Your Engineering Team: James Baker
Read time: 5 mins
Kentucky-based Haydon Materials Uses Propeller for Quarry End-of-Month and More
Read time: 5 mins
The Pocket Guide to Summer Drone Surveying
Read time: 4 mins
2D or Not 2D? When to Use 2D and 3D in Your Site Modeling
Read time: 4 mins
Meet Your Engineering Team: Tony Luk
Read time: 4 mins
Women in Construction Q&A: Morgan Corp.’s Tiffany Sullivan
Read time: 6 mins
hensel phelps worksite in Propeller
Hensel Phelps Is Using Propeller to Track Earthwork, Share Data on Hawaii State Hospital Build
Read time: 5 mins