Resource Center

Real stories, helpful guides, and the latest from the field.

Aerial 3D render of a data center construction site with graded earth, utility trenches, and drainage controls transitioning into a digital site map
Featured article

The data center environmental risk contractors can actually control

Data center projects move fast, disturb large areas, and invite scrutiny over how teams manage land, water, and utilities. A clear, timestamped site record is the environmental risk contractors can actually control.

A drone flying over a construction site
Nine ways drone survey software can make your next project a success
Read time: 7 mins
free trial for liquid drop analysis
Keep your worksite above water with Propeller’s hydrology tools
Read time: 4 mins
DJI M3E drone, AeroPoints, DJI M350 Drone, and Zenmuse L2 Sensor
Photogrammetry & LiDAR Accuracy
Read time: 4 mins
Managing linear projects at scale with Alignments
Read time: 5 mins
Propeller AeroPoint on worksite with construction machines
“Drone surveying saves time and manpower at Daniel Charles Surveys” Awesome Earthmovers | 2024
Read time: < 1 min
Happy 10th birthday, Propeller
Back to the future: Celebrating 10 years of Propeller
Read time: 7 mins
Map export in Propeller
Mapping success: The art of data sharing with Propeller
Read time: 7 mins
Propeller workspaces allows you to organize your site data
Introducing Workspaces: Keeping your worksite data organized and under control
Read time: 4 mins
Centralizing project documentation: What data can you store and share in Propeller?
Read time: 4 mins
Aerial photo of a waste management work site.
From trash to treasure: Propeller’s top 5 waste management workflows
Read time: 5 mins
open pit mine
Rock solid strategies: Propeller’s top 5 workflows for mining and aggregates
Read time: 5 mins
Aerial photo of two earthmovers on site.
The top 5 earthwork progress-tracking workflows
Read time: 5 mins